PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Footings F 1.9, F 2.5, - H2.5 Prepped for Concrete.JPG Elevators 1, 2, - 3 Foundation wall forms.JPG Site from South East Corner.JPG Stair 2 and Elevator 4 Forms Stripped.JPG Formwork from E1 to H1.JPG Elevators 1, 2, - 3 Formwork at foundation wall.JPG Formwork from E1 to H1 (2).JPG
Previous pageNext page Formwork from E1 to H1
Formwork from E1 to H1